Before commencing the design stage, the relation between the project's scope to the site's zoning must be explored and understood. Peter Rose and his staff have extensive experience working with highly differing and often complicated local zoning ordinances, that can change according to region, city, neighbourhood or even block. These differences have a profound influence on many aspects of a given project's development, and should not be underestimated. As well, within a particular zone there may be more than one possible stream for designing the project and obtaining permits. This may drastically affect the size of the project, the style, and the length of time it takes to get permits. Where required, a BC land surveyor will be engaged at the beginning of this phase to produce a survey specific to the zone in which the property sits.